Rampal, Matarbari, Payra and Banshkhali

Four big coal plants at a glance

ItemRampalMatarbariPayraBanshkhali
LocationRampal, BagerhatMoheshkhali, Cox's BazarDhankhali, Kalapara, PatuakhaliBanshkhali, Chattogram
River/waterPashur riverKohelia river to the east; Bay of Bengal to the south and westAndharmanik river—
Capacity1,320 (2×660) MW1,200 (2×600) MW1,320 (2×660) MW1,320 MW
FuelCoalCoalCoalCoal
Partner/financeIndia and BangladeshJapan and BangladeshJoint with China (BCPCL)S Alam Group (70%) and China

Rampal (Maitree Super Thermal Power Plant)

  • Run by Bangladesh-India Friendship Power Company (BIFPCL), a 50:50 venture of India's NTPC and Bangladesh's PDB
  • Foundation stone: 5 October 2013
  • First unit formally inaugurated in September 2022 (the book says 6 September)
  • Second unit inaugurated on 1 November 2023 by Sheikh Hasina and Narendra Modi, virtually
  • Builder: India's BHEL; consultant: Germany's Fichtner Group; ultra super-critical technology
  • About 14 km north of the Sundarbans; UNESCO objected over environmental damage

Matarbari

  • Project name: Matarbari Ultra Super Critical Coal Fired Power Project
  • Loan agreement: 16 June 2014; construction launched: 28 January 2018
  • On 11 November 2023 the Prime Minister inaugurated the first unit (600 MW) and the Single Point Mooring (SPM)
  • Area 1,414 acres; contractor: Sumitomo–Toshiba–IHI consortium; implementing company CPGCBL

Payra and Banshkhali

  • Payra: foundation stone 14 October 2016; inaugurated 21 March 2022; built by Bangladesh-China Power Company (BCPCL)
  • Payra was the first use of ultra super-critical technology in Bangladesh (by the book)
  • Banshkhali: the country's biggest private-sector plant; also known as the SS Power Plant
  • Bangladesh is 13th in the world in using ultra super-critical technology (Khandokar)
  • The book names Rampal and SS Power (1,320 MW) as large plants

Did you know?: The 50 MW Sutiakhali solar plant is at Gouripur, Mymensingh, and has operated since 2020. A larger solar plant was approved in 2026, but it is not yet built.

Check yourself

Where is the Matarbari power plant, and which country is helping?

At a glance

  1. 1

    Rampal (Bagerhat, Pashur river): 1,320 MW, BIFPCL; second unit inaugurated 1 November 2023.

  2. 2

    Matarbari (Moheshkhali): 1,200 MW, Japanese support; first unit 11 November 2023.

  3. 3

    Payra (Kalapara, Patuakhali, Andharmanik river): 1,320 MW; inaugurated 21 March 2022.

  4. 4

    Banshkhali (Chattogram): the largest in the private sector, 1,320 MW.

  5. 5

    Rampal is about 14 km north of the Sundarbans; UNESCO objected.